With current production the newly design ball mill ring gear dust guard is performing excellently. We have had two inspections since its installation and everything was perfect, no loose bolts or cracks in the plastic.
Zero noise is produced from it during operation. It made life much easier, cheaper and a lot safer to install. Two contractors undertook the installation and completed it in under 12 hours. It took three contractors 20 hours to install the steel dust guard due to the amount of welding along with using gantry crane. Each plastic piece was designed to be generic so any section can be drilled and fitted quickly, in place of another, if any problem is detected with any 2 meter section.
Thank you for your input and cooperation too. Was great working with you. It is a well thought out, engineered piece, which will save the plant thousands in downtime and labour to come to closure.
Michael Blake
Engineer, Lisheen Mine
I would like to thank you Tom and your Company for the top class service you gave to Lisheen and myself. After 17 years I am moving on to a new path in my life. I wish you the very best in the future
Brian Doherty
Mechanical Foreman, Lisheen Mine
September 2017 : We have been using OFN Bearings with huge success since our first introduction to this product in 2014. It has exceeded all life expectancy for our choosing applications. We have expanded this product to all our new screw conveying installation. For us this is the standard going forward. Very happy with this product
Engineering Plastics Ltd
Units 2/3, 50B Tullyard Road
Cookstown
County Tyrone
BT80 9BB
Northern Ireland
T: 028 8676 0058
ROI: 048 8676 0058
sales@engineeringplasticsltd.com